<div dir="ltr">Noob post, let me know if I'm not formatting properly or otherwise screwing this up. <div><br></div><div>I have experience doing this type of install, I am not licensed. I think $400 is a fantastically cheep deal (labor and materials), however, I will need to discuss to be sure I have a handle on the scope of what Sudo wants. I am available this weekend to work on the install and am totally wiling to follow someone else's lead. We can borrow condi benders from the tool library up the street (tele @51st), they might even have a pull-tape which we will need. Lets talk to coordinate material lists, tools, and meeting time. <div>
<br></div><div>I would suggest opting for quad plugs rather than duals, metal boxes w/ metal faces and individual wire spools for the the pulls (14awg white, blk and green). </div><div><br></div><div>We need to make drawings of where the outlets will be & where we will access power. This is important because we may need to put in junction boxes for long runs and/or increase the condi size over 1/2 inch, and we are likely installing new 20A braker(s). </div>
<div><br></div><div>Lastly, who will be signing off on the work prior to making it HOT?</div><div><br></div><div>you can reach me at </div><div>510.396.5510</div><div><br></div><div>Thanks,</div><div>Whitney <br><div><br>
</div><div><br></div></div></div></div>