<div dir="ltr">Jake,<div>I understand you are the Lead for the electric install. Please look at the attached .pdf, I made a first pass on the locations of outlets. I think we should use the 3 free breaker spaces in the Balcony breaker box, in addition to the abandoned "marquee" breaker. Looking at the front of the Sub-panel above the stage it looks like the plan is to power the robot arm directly from there, with a 30A breaker. </div>
<div><br></div><div>Also we need to figure out the plan for the conduit runs after the outlet type and locations are finalized. We will need volunteers to help with prepping the space for install (moving shelving etc away from walls), and for doing the installation. </div>
<div><br></div><div>Let me know what else I can do to get power to the people! The draft should be reviewed by everyone to be sure we are planning for all needs. </div><div><br></div><div>For example- what are the immediate power needs for the server? Can we build in the potential for up-sizing? Similarly for the robot arm- where will it be located? It requires 3phase 240 correct?</div>
<div><br></div><div>Thanks,</div><div>Whit</div></div>