<div>The following is for building & human safety:</div><div><br></div>1. Please email the discuss and building groups PRIOR to beginning work on electrical, with the following infos:<div>- your ph# and email</div><div>- brief description & location of work being performed including relevant (sub)panel</div><div>- anticipated date, & length of outage if any</div><div><br></div><div>2. While you are working, leave a note on the relevant panel with your name, ph#, & email, as well as instructions as to what breakers must be left off while you are working. </div><div><br></div><div>3. When you have to leave, do not leave any exposed wiring: Panel covers must be put back on, outlets covered, etc.</div><div><br></div>4. Please send a message to discuss & building lists with the status of the work, what was changed, what breakers are re/dis-connected and to what, etc, if it is finished and if not when/what is needed to do so, etc.<div><br></div><div>Hope that is agreeable to all?</div><div><br></div><div>David<span></span><br><div><div><br></div></div></div>