<div dir="ltr"><p style="margin:0px;line-height:normal;font-family:helvetica"><b><i>Hello All, </i></b></p>
<p style="margin:0px;line-height:normal;font-family:helvetica;min-height:13.8px"><br></p>
<p style="margin:0px;line-height:normal;font-family:helvetica">Today (Saturday) thanks to Marc, Rob, and yours truly the server "cage" area got some Love. : )</p><p style="margin:0px;line-height:normal;font-family:helvetica">It still needs more love, but with a vacuum and a brush to get the dust out under the four post rack, and production gear itself.<br>And not to mention all the wiring that will need to be redone (but this for part the future).</p>
<p style="margin:0px;line-height:normal;font-family:helvetica;min-height:13.8px"><br></p><p style="margin:0px;line-height:normal;font-family:helvetica;min-height:13.8px"><b>AN IDEA IN PROGRESS: </b><br>Migrate all gear and patch panels into the four post rack, so we gain more space by removing the two posts rack.<br></p><p style="margin:0px;line-height:normal;font-family:helvetica"><br></p><p style="margin:0px;line-height:normal;font-family:helvetica;min-height:13.8px"><b>MOVING THINGS IN AND OUT:</b></p><p style="margin:0px;line-height:normal;font-family:helvetica;min-height:13.8px">* The three old red servers that were not in used were removed.</p><p style="margin:0px;line-height:normal;font-family:helvetica;min-height:13.8px">* The server that Marc had configure (I forgot what is what the told me he had configured) got install in the four post rack. <br></p>
<p style="margin:0px;line-height:normal;font-family:helvetica;min-height:13.8px">* The 2 HP switches got moved to the 2 post rack to the 4post rack.<br>* There is old stuff and things we are not going to use. I feel we should check with Marcus and see if we can add these items to the "pay what you can" sale event. Rob suggested to have a list and announce the items for that sale, and also suggested that we put some of that stuff in eBay. </p>
<p style="margin:0px;line-height:normal;font-family:helvetica;min-height:13.8px"><br><b>NEW (USED) GEAR THINGS RUNNING:</b><br>* The 24 and 38 HP switches are running along w the Ruckus wireless controller, and one of Ruckus Access Points. </p><p style="margin:0px;line-height:normal;font-family:helvetica">* This AP was temporarily set on top of one of the servers and pointing to the Sudoroom tables, pushing the "Omni Commons" SSID. :) </p>
<p style="margin:0px;line-height:normal;font-family:helvetica;min-height:13.8px"><br><b>COMING TO OMNI EARLY IN THE MORNING:</b></p>
<p style="margin:0px;line-height:normal;font-family:helvetica">I am considering to come to omni about 6:30am (after taking my better half to work).<br><br><b>PLAN FOR SUNDAY EARLY MORNING PLAN:</b><br>Since I am going to the there early, and Marc already gave me the Gateway Server interfaces (LANs) overview, I feel that it would be a good time to swap their cables to connect to the HP switches, and these to feed the Dell Switches instead. By doing this I don't perceive anything going south. <br><br><b>WHY ARE WE DOING THIS?:</b><br>Marc and I talked about it, and we agreed that doing this will allow us to have a nicer and controlled migration, so we don't have to do that all at once. This is trivial, now that I know what LANs is each interface at the Linux server level. <br><br><b>BTW:</b><br>We started about 11AM something, and ended about 7:40PM. It was a whole day thing. <br><br>Thank you, and please let me know if you have any questions. I will check email before starting anything tomorrow.</p><p style="margin:0px;line-height:normal;font-family:helvetica"><br></p><p style="margin:0px;line-height:normal;font-family:helvetica">Daniel Arauz</p><p style="margin:0px;line-height:normal;font-family:helvetica">Signal: 415.336.9143</p><p style="margin:0px;font-size:12px;line-height:normal;font-family:helvetica"><span style="font-size:12pt"><br></span></p>
</div>