Thanks everyone for your efforts so far!
Remaining jobs to finish by
early Thursday morning, in vague priority order, and probably
not exhaustive
- Shattuck and 48th st doors - adjust panic bars and door
hardware so they open easily
- Remove or safely store fluorescent tubes that are in
corner of EH
- Put a gas shutoff wrench by gas meter if there isn’t one
- Safely store boxes of batteries in sudo
-
Install smoke detectors (in locked storage)
- 48th st hallway - rehang fire extinguisher, paint and
install baseboards and or molding if we have, remove blue
tape, final mop, leave completely clear (bonus points if
you can mop/scrub the hallway to the bocce court with TSP
while you're at it)
- Matt, Monk, electrical crew - fisnish mapping electrical
system, covering open panels, emergency lighting and exit
signs installed and functional, wiring, replacing eh
fixtures, etc
- BASEMENT - organize onto shelves or get rid of all
stuff in piles; Make basement look like storage, not event
space; store Ken finish removing stuff, organize printers,
remove all shiny stuff from ceiling, remove and store all
extension cords
- Finish painting wooden windows
- Remove/paint over small amount of graffiti on outside of
building towards 48th st doors
- Finish and install awning
- Move stove remnants, other metal from basement kitchen to
EH for metal waste pickup on Wednesday
- Bocce court bathroom - clean and organized, w compost and
trash cans
- 48th st hallway - rehang fire extinguisher, paint
and install baseboards and or molding if we have, final mop,
leave completely clear
- Stage left bathroom - paint stained side of ceiling w
glossy white, also stalls. remove graffiti on mirror,
general cleaning
- Disco room - finish painting, clean plexi
floor, remove mirrors that aren’t hung to dump or
store safely, restick Marley (tape in cabinet is disco room
- Luka watched video on how to lay properly. If there isn't
time for this just layit out flat over the floor )
- Small classroom- remove excess chairs, boxes in front of
electrical panel, cobwebs, straighten out
- Bathrooms cleaned
- Ballroom bar - final sweep and organize
- Trash room - should look organized w minimum stacked
cardboard
- Make sure Shower is not dripping
- Entry area to bocce court organized
- Get rid of all trash piled in sudo
- Basement
northwest corner (where Village stuff was) ceiling water
damage - cover and potentially replace damaged ceiling
tiles
- Remove hanging wires in den. If time, prime and paint
ceiling
- Sudo mesh area organized
- Move Stage section upstairs
- Fix broken stair steps
- Disco room door - Wash w tsp; if time, prime and paint w
grey in the storage
- Wednesday evening - fisnish up any work in progress,
general cleaning and organizing so everything is in its
place, organize trash cans in rooms (a trash, recycling
and compost can grouped together, except bathrooms need
one compost and one trash) and put in bags/liners