CodeCompliance-Bldg |
1 |
fire extinguisher |
anyone |
Entire room perimeter |
5LB ABC Fire extinguishers at correct height every ~75' - starting with under each exit sign |
CodeCompliance-Bldg |
1 |
light cover |
anyone |
left (west) CCL storage room |
put bulb covers over the 2x 4' flourescents in this storage room |
CodeCompliance-Bldg |
1 |
light cover |
anyone |
left (west) CCL storage room annex |
put bulb covers over the 2x 4' flourescents in this storage room's annex/closet |
Electrical |
1 |
elec. wiring |
experienced electrician |
CCL |
install planned LED's within, or otherwise, replace cover / restore open flourescent fixture (exposed wiring) - jake's project? |
Electrical |
1 |
light fixture |
experienced electrician |
hallway |
Install covered ceiling light in sudo hallway, facing sudo just before doorway to cafe |
Electrical |
1 |
elec. conduit |
experienced electrician |
perimeter of CCL area & storage rooms |
run new conduit / circuits in CCL to reduce excessive extension cord usage (fire code) |
Electrical |
1 |
elec. conduit |
experienced electrician |
west wall |
run more 3/4" conduit further down west wall. Must know code. |
CodeCompliance-Bldg |
3 |
data wiring |
experienced telco/wiring person |
along perimeter / walls of sudo/ccl |
do better job of affixing & routing low-voltage 'inside wiring' ie all ethernet, phone cabling |
CodeCompliance-Fire |
1 |
shelving |
limited construction exp |
|
Create dedicated space for storing excess lumber (long pieces), pipe. metal pieces etc so they are not in jumbles (fire code) |
CodeCompliance-Bldg |
2 |
plywood cover |
limited construction exp |
left (west) CCL storage room |
make plywood plate to cover / inset over exposed ejector pump sticking out under wall |
Electrical |
1 |
elec. faceplate |
limited construction exp |
right (east) CCL storage room |
cover exposed octogon junction box in ceiling with appropriate octogon plate |
CodeCompliance-Fire |
3 |
door |
limited construction exp |
stairwell to basement |
sand down side of door so it does not stick closed so bad (belt sander optimal) |
Construction-Finishing |
1 |
door panic bar |
lockset experience |
hallway door |
Install panic hardware & lock to this door |
Construction-Finishing |
1 |
door closer |
moderate |
Ballroom door |
put closer on this door |
Construction-Finishing |
1 |
door closer |
moderate |
Basement door |
if possible, put closer on this door (might not be possible.) |
Construction-Finishing |
1 |
door closer |
moderate |
hallway door |
Install closer to door |
Electrical |
1 |
ballast |
moderate electrical exp. |
left (west) CCL storage room annex |
replace ballast in flourescent fixture in this room |
Electrical |
1 |
elec. wiring |
moderately experienced electrician |
right (east) CCL storage room |
replace exposed wiring from new LED fixture to ceiling with armored flex or EMT |
|
1 |
bathroom |
anyone |
Hallway Bathrooom |
install paper towel dispenser and paper towels |