The previously-detailed scope of electrical maintenance at Sudo has completed:

- Additional receptacles can now be found along the east side of Sudo. 

(Per code, please no more extension cords in this area, and any UL-listed surge protectors directly connecting to these receptacles need to be wall-mounted.)

- The long hanging extension cord up to the DIY roof exhaust fan has been permanently removed.

To my knowledge, this maintenance work did not involve de-powering any Sudo’s equipment, and internet access was not interrupted. 

Thank you,
David 

On Sat, Oct 16, 2021 at 11:56 David Keenan <dkeenan44@gmail.com> wrote:
Hi all, 

Per prior discussion, electrical maintenance will be conducted to increase the number of available receptacles in the southeast portion of sudo room, near sudo's fridge & stairs down to basement, in order to remove life-safety hazards presented by excessive extension cords / power strips in this location under/adjacent to an unrated mezzanine etc. This work is now planned for Monday 10/18 in the AM. 

This work will likely require temporarily de-powering one or more circuits to Sudo Room presently feeding receptacles in this particular area and along portions of the south wall. 

Please ensure all steps are taken to save work and safely depower equipment in this area prior to this work, or provide me with instruction to safely do these things, including the sudo mesh cage. This work may impact internet access within the building while work is being undertaken. The maintenance window is not planned to last longer than a single day. 

'Small' one-off jobs like this can be difficult to affordably schedule well in advance, as they are typically subject to electricians' squeezing in the work around bigger jobs they have elsewhere. Therefore, in most cases we are unlikely to get more than ~2 days advance notice as in this case. 

Separately, on Sunday 10/17, an electrical assessment will be undertaken to see how providing more compliant power to the ad-hoc / DIY exhaust fan on sudo's roof (south roof area of back room) could be accomplished. Providing more permanent electrical power to this fan will not necessarily be undertaken sunday, but it is possible. Assessing / addressing the roof fan issue should not directly impact power to sudo or ccl on Sunday, but if and when this becomes required, I will notice sudo and ccl. 

Thanks to everyone for bearing with these ongoing life-safety improvements to the building and please hit me up with any questions or concerns.  

Thank you,
David // 415-430-8362