* 1 - Really powerful wireless router
* ~10 - Really nice wireless Access Points (APs) like the Ubiquiti Unifi UAP-Pro or better.
* ~10 - Wireless Access Points (APs)
* ~5 - Low-power gigabit switches
* ~5 - Low-power Switches


===Plan===
===Plan===
Line 39: Line 38:
===Wishlist (in progress) ===
===Wishlist (in progress) ===
Note:  
Note:  
- Prices listed below are as reference only and are not including shipping. We need to research if we can find a cheaper vendor. -Also, please notice that we are listing two racks, a 2 post and a 4 post rack, assuming that we want them. But, because the $ factor we could just choose one 4 post rack only, that I believe can handle Switches and Servers and the amount of them that we currently have. But eventually with expected grow we may need to separate these two groups. Having these two racks now will keep things in their place, and reduce the overhead work that only one rack will provide. -VERY IMPORTANT: Please don't be shy to ask, comment, or provide suggestions; Sudo (and Omni) members participation is very welcome. Wiring Scheme to be used: T568B.
If this 'wish list' becomes a reality will get us with a solid backbone network; for a good amount of years to come.  
Anyway, We are listing two racks, a 2 and 4 post racks. But, if $ is an issue then I suggest that we make the effort to get one 4 post rack with [http://www.server-racks.com/rack-hole-types.html square holes]. This [http://www.panduit.com/wcs/Satellite?c=Page&childpagename=Panduit_Global%2FPG_Layout&cid=1345565612156&packedargs=item_id%3DR4P%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%26locale%3Den_us&pagename=PG_Wrapper 4 post rack] would be able to handle switches and rack servers as well. Also essential, if chosen to have a CAT6A backbone, connectors, patch panels, cables should be CAT6A. Otherwise if one of those items is CAT5 or CAT5e, then the network will go for the lowest Category available.
-Wiring Scheme to be used: T568B.
-Sudo and all Omni Collective members participation is very welcome; ask/answer/suggest/comment/etc.
'''PLEASE READ:''' We got the racks, and some horizontal cable management parts. We NEED to review what way we are going in regards of cable, CAT5e? CAT6? CAT6A? At this point, Aug 05, 2014, I am okay either way: CAT6 or CAT6A. What this means is that this list below is not final, neither the vendor showed below. We should consider Leviton also, good and less expensive than Panduit.. Thanks, Daniel.


Please see a pasted email right after this list of parts. It has several questions that we need to consider. Ty!


'''TOC'''
'''TOC'''


* Switch Rack
* Switch Rack (We got it!)
* Server Rack
* Server Rack (Expected arrival Thu 2014.07.31 or Fri 2014.08.01)
* Patch Panel for Switch Rack (2RU)
* Patch Panel for Switch Rack (2RU)
* Patch Panel for Server Rack (1RU)
* Patch Panel for Server Rack (1RU)
Line 58: Line 61:
* Miscellaneous
* Miscellaneous


TOTAL (approx): $
'''Switch Rack:''' (We got it!)
 
'''Switch Rack:'''
** Quantity: 1  
** Quantity: 1  
** Item: Panduit 2 Post Modular NET FRAMEâ„¢ Rack
** Item: Panduit 2 Post Modular NET FRAMEâ„¢ Rack
Line 69: Line 70:
** Accessories: Not included in price shown above, we need to discuss which ones should we getting.
** Accessories: Not included in price shown above, we need to discuss which ones should we getting.


'''Server Rack:'''  
'''Server Rack:''' (Expected arrival Thu 2014.07.31 or Fri 2014.08.01)
** Quantity: 1
** Quantity: 1
** Item: Panduit 4 Post Rack
** Item: Panduit 4 Post Rack
Line 125: Line 126:
** Item details: [http://www.panduit.com/heiler/SpecificationSheets/D-COSP199--WW-ENG-Cat6AUTPCopCable-W.pdf Details Here]
** Item details: [http://www.panduit.com/heiler/SpecificationSheets/D-COSP199--WW-ENG-Cat6AUTPCopCable-W.pdf Details Here]
** Price: [http://www.bestpricecables.com/blue-1000ft-cat-6-plenum-550mhz-premise-horizontal-bulk-cable-23awg.html $325]
** Price: [http://www.bestpricecables.com/blue-1000ft-cat-6-plenum-550mhz-premise-horizontal-bulk-cable-23awg.html $325]
Learning more about CAT6A: [http://www.panduit.com/heiler/SelectionGuides/D-COSG03--SA-ENG-TX6A10GigUTPSystem.pdf How to select Cable by Panduit] and [http://www.leviton.com/OA_HTML/ibcGetAttachment.jsp?cItemId=80036 Leviton CAT 6A Reference Guide (Very Good!) ].
NOTE: We also accept CAT5e donations for non-backbone use.
NOTE: We also accept CAT5e donations for non-backbone use.


Line 136: Line 139:
NOTE: We also accept CAT5e donations.
NOTE: We also accept CAT5e donations.


'''Vertical Cable Management Trays'''
'''Vertical Cable Management Trays'''  
** Quantity: 2  
** Quantity: 2  
** Item:  
** Item:  
Line 144: Line 147:
** Price: $
** Price: $


'''Horizontal Cable Management Tray'''
'''Horizontal Cable Management Tray''' (We got some donated!)
** Quantity: 1  
** Quantity: 1  
** Item:  
** Item:  
Line 152: Line 155:
** Price: $
** Price: $


'''Miscellaneous :'''
'''Miscellaneous'''
** Cagenuts and screws
* Cagenuts and screws (We got them!)
** Wire ties
* Wire ties
** A roll of Velcro
* A roll of Velcro
* Anything else???


TOOLS: I have a set that we can use.
TOOLS: I have a set that we can use.


=== QUESTIONS/ANSWERS/COMMENTS ===
=== Questions/Answers/Comments ===
* What do you think about Someone's suggestion of going for a wall rack instead?: [http://www.server-racks.com/selecting-a-wall-mount-rack.html Selecting a Wall Mount Rack]
Date: Tue, 17 Jun 2014:
* Can we find someone to bend chicken-wire into the tracks we need to hang from the ceiling? <-- not sure if this will up to code (legal), we will need to find
 
'''Pasted E-Mail Starts Here'''
Subject: The New Server Room
Date: Tue, 17 Jun 2014 <snip><snip>
From: <snip><snip>
To: <snip><snip>
CC: <snip><snip>, <snip><snip>, <snip><snip>,  <snip><snip>
 
Thank you <snip><snip>.
<snip><snip>, and <snip><snip> thank you for questions and interest.
 
I've not done the walk-through yet because of the somewhat restricted access to the whole building, so no photos.
I've not done the walk-through yet because of the somewhat restricted access to the whole building, so no photos.


Here are other questions that I suggest we should look for their answers also:
1.- Based on the current equipment and envisioning the future of Sudo-SudoMesh(-Omni) what size room do we need?
1.- Based on the current equipment and envisioning the future of Sudo-SudoMesh(-Omni) what size room do we need?
2.- How is the potential room airflow?
2.- How is the potential room airflow?
3.- How is temperature of the room, now and during the Summer?
3.- How is temperature of the room, now and during the Summer?
4.- Are there electrical outlets nearby?
4.- Are there electrical outlets nearby?
5.- Do we have enough Amps in that area?
5.- Do we have enough Amps in that area?
6.- If not, do we need to install a circuit breaker box with scalability?
6.- If not, do we need to install a circuit breaker box with scalability?
7.- Room's accessibility?
7.- Room's accessibility?
8.- Security: Who and when people have access to it when no Sudoers are present?
8.- Security: Who and when people have access to it when no Sudoers are present?
9.- What type of racks, 2 or 4 of both size rack? or no this of rack? Someone mentioned a wall mount rack in the open?
9.- What type of racks, 2 or 4 of both size rack? or no this of rack? Someone mentioned a wall mount rack in the open?
10.- If 2 or 4 post rack, should we get CAT6A ready? This means that at least the backbone wiring, Patch panel, and connectors need to CAT6A.


Just these questions for now... but I encourage others to please add/correct/comment/suggest as needed.
10.- If 2 or 4 post rack, should we get CAT6A ready?
This means that at least the backbone wiring, Patch panel, and connectors need to be CAT6A.
 
'''Questions from others fellow hackers:'''
 
11.- What do you think about Someone's suggestion of going for a wall rack instead [http://www.server-racks.com/selecting-a-wall-mount-rack.html Selecting a Wall Mount Rack]?
 
12.- Can we find someone to bend chicken-wire into the tracks we need to hang from the ceiling?
 
=== SERVER ROOM UPDATES ===
'''2014/07/05:'''
 
Today Luis, Matt, and I did the walk in the building, and so far the only place that seems the
most appropriate to have the server room is the room by the bar.
 
This area is the most ideal in the whole building because the air flow,
temperature, electricity proximity, and also because it is where the
Internet access enters the building.
 
Since this area is not is not part of the SudoRoom space, we will have
to talk about it with the rest of the Sudo-Mesh group and the group approves it, then we would have to present the idea at our
Omni Collective meeting for approval.
 
If approved by the Omni Collective, we would need to build:
 
* A 2" or so high floor (two by fours and plywood would do, I believe.
* A 55" x 65" cage with chicken wire walls and a door.
 
If this place is NOT approved by the OOC then perhaps we should consider
building the Server Room in the SudoRoom Space. High temperature and noise levels are the main issues. 
 
If others have ideas/comments/or want to be part of this process please
jump in. You may contact Matt, Luis, or myself (Daniel).
 
'''SERVER ROOM UPDATE JULY 21, 2014 7:13AM'''
 
Hello all,
 
We finally concluded that the small stage that oversees the Sudoroom is
where we'll put the Server Room. Yes, the area behind the SudoRoom sign.
This particular area is full of wood and other stuff that needs to move out,
so if you feel helping on this part of Sudo Reboot, please do.
 
If you have any questions or need more info on how to help please check
with Marc, David, Daniel, or Jeremy.
 
'''SERVER ROOM UPDATE JULY 21, 2014 11PM'''
 
Awesomeness: Thanks David K, David ?, Jeremy, and Sally for your help.
That was a lot of stuff that we moved!!
 
The area got 96% cleared up. We moved the 2 Two Posts Racks, and the
improvised server cart holding three two Servers and a Dell Desktop.
 
If someone could clear up the rest of the stuff would be super! What is
left? A black big cabinet, and miscellaneous stuff left on and around
the shelf.
 
Many Thanks!
 
'''2014.07.30 Server Room Update!:'''
 
Switch Rack(s):
We have installed some switches on one of the three donated racks.
 
Yes! We have a surplus of two switch racks.
Please feel free to provide ideas on what should we do with them, so far we have the following ideas:
a) Jeremy suggested that we should sell them, we can use the cash.
b) I suggest that we keep one so we can install the spare switches and provide a managed switch reset/configuration workshop. And for the second one, I suggest, we  offer it as a donation to other hacker space as a symbol of solidarity and sisterhood.
 
Chris, who is the one that donated those two switch racks, said that he is cool with whatever we decide.
 
Rack Switch:
 
It is on the way, and it is expected to arrive Thursday or Friday.
 
The shipping company said today that will call me to arrange delivery time, so we need someone to be here (Sudo) to receive it.
- -Marc said he could receive it, but only after 5pm, is anyone else available at earlier time?
If so, please let me know so I can provide you w the info that you may need.
 
Still Needed Items for a Server Room and Backbone Network CAT6A Ready:
* 1 Patch Panel for Switch Rack (2RU)
* 1 Patch Panel for Server Rack (1RU)
* 24 Category 6A Jack Modules
* 50 RJ45 Connectors
* Network CAT6A Bulk Cable
* Network CAT6A Patch Cable
 
Please let me know if you know of anyone that would like to donate any of the items above.
 
Many thanks!
 
Daniel
 
'''2014.08.02 Server Room Update'''
 
First at all many thanks to the one (forgot his name, sorry) that waited
for the delivery on Friday, and to those that helped in the process of
getting the rack up and going.
 
The rack server is up and going, but still needs the patch panels, cable,
and the RJ45 modules. More details below. Anyhow, adding these accessories
to the rack would make the rack wiring cleaner and easy to follow when the
time of troubleshooting comes.
 
Items needed:
* 1 Patch Panel for Switch Rack (2RU) = Price: $62.12
http://www.amazon.com/Panduit-CPPL48M6BLY-48-Port-Patch-Panel/dp/B008EKS86Q
 
* 1 Patch Panel for Server Rack (1RU) = Price: $39.45
http://www.amazon.com/Panduit-CPPL24M6BLY-24-Port-Patch-Panel/dp/B0083R9PHG
 
* 24 Category 6A Jack Modules = Price ?
http://www.panduit.com/heiler/InstallInstructions/N-COPN-511--REVD--ENG.pdf
 
* Network CAT6A Bulk Cable = Price: $325
http://www.bestpricecables.com/blue-1000ft-cat-6-plenum-550mhz-premise-horizontal-bulk-cable-23awg.html


For those interested here is the link to the 'wish' list that I've been working on:
Thanks, and please let me know if you would like to donate any of the
https://sudoroom.org/wiki/Network/Reboot#Phase_2:_Proper_Wired_Network
above items.


Thank you,
Daniel
<snip>
'''Pasted E-Mail Ends here'''


=== Definitions ===
=== Definitions ===

Navigation menu