=== Questions/Answers/Comments === | === Questions/Answers/Comments === | ||
* What do you think about Someone's suggestion of going for a wall rack instead? | * What do you think about Someone's suggestion of going for a wall rack instead? ( [http://www.server-racks.com/selecting-a-wall-mount-rack.html Selecting a Wall Mount Rack] )? | ||
* Can we find someone to bend chicken-wire into the tracks we need to hang from the ceiling? | * Can we find someone to bend chicken-wire into the tracks we need to hang from the ceiling? | ||
Date: Tue, 17 Jun 2014: | |||
I've not done the walk-through yet because of the somewhat restricted access to the whole building, so no photos. | I've not done the walk-through yet because of the somewhat restricted access to the whole building, so no photos. | ||
1.- Based on the current equipment and envisioning the future of Sudo-SudoMesh(-Omni) what size room do we need? | 1.- Based on the current equipment and envisioning the future of Sudo-SudoMesh(-Omni) what size room do we need? | ||
2.- How is the potential room airflow? | 2.- How is the potential room airflow? | ||
3.- How is temperature of the room, now and during the Summer? | 3.- How is temperature of the room, now and during the Summer? | ||
4.- Are there electrical outlets nearby? | 4.- Are there electrical outlets nearby? | ||
5.- Do we have enough Amps in that area? | 5.- Do we have enough Amps in that area? | ||
6.- If not, do we need to install a circuit breaker box with scalability? | 6.- If not, do we need to install a circuit breaker box with scalability? | ||
7.- Room's accessibility? | 7.- Room's accessibility? | ||
8.- Security: Who and when people have access to it when no Sudoers are present? | 8.- Security: Who and when people have access to it when no Sudoers are present? | ||
9.- What type of racks, 2 or 4 of both size rack? or no this of rack? Someone mentioned a wall mount rack in the open? | 9.- What type of racks, 2 or 4 of both size rack? or no this of rack? Someone mentioned a wall mount rack in the open? | ||
10.- If 2 or 4 post rack, should we get CAT6A ready? | |||
This means that at least the backbone wiring, Patch panel, and connectors need to be CAT6A. | |||