Rack Switch:
Rack Switch:


========
It is on the way, and it is expected to arrive Thursday or Friday.
It is on the way, and it is expected to arrive Thursday or Friday.


Line 239: Line 238:


Still Needed Items for a Server Room and Backbone Network CAT6A Ready:
Still Needed Items for a Server Room and Backbone Network CAT6A Ready:
===============================================
* 1 Patch Panel for Switch Rack (2RU)
* 1 Patch Panel for Switch Rack (2RU)
* 1 Patch Panel for Server Rack (1RU)
* 1 Patch Panel for Server Rack (1RU)
Line 248: Line 246:


*Patch Panel for Switch Rack (2RU):*
*Patch Panel for Switch Rack (2RU):*
  *
       o Quantity: 1
       o Quantity: 1
       o Item: Panduit MIni-Com Modular Patch Panels with Faceplates
       o Item: Panduit MIni-Com Modular Patch Panels with Faceplates