Difference between revisions of "Mesh/Mounting"

Jump to navigation Jump to search
1,001 bytes added ,  20:27, 9 June 2018
m
phrasing
m (phrasing)
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
=Mounting Rooftop Nodes=
=Mounting Rooftop Nodes=


Also, see https://github.com/sudomesh/mounting .
This wiki article is perhaps more accessible than GitHub, and content here is appreciated. However, please see also https://github.com/sudomesh/mounting .


==Node Mount Inventory Checklist==
==Node Mount Inventory Checklist==
Line 46: Line 46:
* Work Boots
* Work Boots


=== 110v materials ===
''Contingent on weather and roof conditions, and assuming the need for extending 110v supply:''
* 1x Receptacle, duplex
* 1x weather-tite box, switch
* 1x weather-tite cover, switch
* 1x weather-tite extension box, switch
* 1box ground screws
* 2x box connector
* 50x exterior straps for:
* 500 lf flexible conduit
* 1 spool 12g thhn, red
* 1 spool 12g thhn, black
* 1 spool 12g thhn, white
* 1 spool 12g thhn, green
* 1 spool 14g thhn, red
* 1 spool 14g thhn, black
* 1 spool 14g thhn, white
* 1 spool 14g thhn, green
* 1 box yellow wire nut
* 1 box red wire nut
* 1 roll black vinyl tape
* 1 box pan-head screw, 1"


Conduit, depending:
* ? ½" EMT conduit ?
* ?  ½" EMT straps ?
* ? ½" flexible weathertite conduit ?
* ? straps for above ?
ID appropriate circuit
* Confirm meter source
* Confirm breaker aligns with wire-size
  (12g to 20 amp, 14g to 15 amp)


== Copied from [[Mesh/Flashing_extender_nodes]] ==
== Copied from [[Mesh/Flashing_extender_nodes]] ==

Navigation menu