73
edits
Dougwinter (talk | contribs) (added 110v materials list) |
m (phrasing) |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
=Mounting Rooftop Nodes= | =Mounting Rooftop Nodes= | ||
This wiki article is perhaps more accessible than GitHub, and content here is appreciated. However, please see also https://github.com/sudomesh/mounting . | |||
==Node Mount Inventory Checklist== | ==Node Mount Inventory Checklist== | ||
Line 47: | Line 47: | ||
=== 110v materials === | === 110v materials === | ||
''Contingent on weather and roof conditions:'' | ''Contingent on weather and roof conditions, and assuming the need for extending 110v supply:'' | ||
* 1x Receptacle, duplex | * 1x Receptacle, duplex | ||
* 1x weather-tite box, switch | * 1x weather-tite box, switch | ||
Line 79: | Line 79: | ||
* Confirm breaker aligns with wire-size | * Confirm breaker aligns with wire-size | ||
(12g to 20 amp, 14g to 15 amp) | (12g to 20 amp, 14g to 15 amp) | ||
== Copied from [[Mesh/Flashing_extender_nodes]] == | == Copied from [[Mesh/Flashing_extender_nodes]] == |