Mesh/27 May 2014

Revision as of 22:09, 27 May 2014 by Tunabananas (talk | contribs) (uploaded 27 may meeting minutes)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Notes

  • Laney College Node
    • Marc setting up the Rocket M5 that will be mounted on the top of Laney College
      • Ubiquiti AirMax Sector 5G-20-90 Hi-gain 20dBi, 90deg, 5GHz AirMax 2x2 MIMO Basestation Sector Antenna
    • With 3 Picostations to disperse the signal in a 360 degree radius
  • Node Monitoring
    • Installing cricket on the dev server to collect SNMP stats from nodes (mini_snmpd).
  • Bank account now set up w/ Western Federal Credit Union
  • Stress test sample submesh:
    • What needs coding first? Ability for nodes with mesh access but no internet access to route correctly (Juul), automatic signal strength adjustment under congestion (Deekoo)
    • When should the stresstest be run?

ToDo