[sudo-discuss] Electric Permit

johanna faust female.faust at gmail.com
Sat Aug 30 18:56:51 PDT 2014


since he knows wtf in this regard -- on a professional level.   as he does
in many others (some surprising).

figured i would go ahead and say it since he isn't here, and so his modesty
is not an obstacle...



..


On Sat, Aug 30, 2014 at 6:44 PM, johanna faust <female.faust at gmail.com>
wrote:

> wouldn't it save us money if we could have someone who knows wtf thyre
> doing (or will not do anything) do some before the electrician is hired?
>
> the steve whom i have nicknamed 'st.' (that expedited the move) will
> prolly be there in the early evening.  if i talk 2 him before that i will
> bring this, my newly sprouted, fruit-still-theoretical scion of the Big
> Tree -- that is renovating the Omni -- to his attn.
>
>
> On Fri, Aug 29, 2014 at 4:53 PM, Patrik D'haeseleer <patrikd at gmail.com>
> wrote:
>
>> [forwarding to omni-building mailing list]
>>
>> So does this mean that Sudo can't complete it's electrical upgrades until
>> CCL does theirs, for example?
>>
>> Patrik
>>
>>
>> On Fri, Aug 29, 2014 at 4:42 PM, Whitney Lawrence <whitneyel3 at gmail.com>
>> wrote:
>>
>>> All,
>>> Having discussed the permit process at length with David and Hol, we
>>> came to the conclusion that coordinating our efforts makes the most sense.
>>> This will save permitting costs and not aggravate the inspector, who
>>> otherwise will need to plan a visit for every piece-wise permit. Electrical
>>> plans should be documented to all extent possible. This means drawings of
>>> what is to be removed and what will need to be installed. The drawings are
>>> not any consequence to the city nor inspector, however, they are very
>>> useful for in-house coordination and contractor bid process.
>>>
>>> The permit should be comprised of generalities that describe the minor
>>> changes to the existing electrical system. Furthermore, it should be for
>>> the *entire* building. Inspection is required prior to electrifying
>>> any new or modified circuits. The inspector will plan on coming one time to
>>> inspect everything, plugs need to be out of their boxes, jbox's exposed w/o
>>> the plate cover (but the cover needs to be present), new breakers should
>>> not be installed in sub-panels unless the entire panel is locked and tagged
>>> out (this means no one can accidentally turn on the supply breaker).
>>>
>>> Lastly, we need to have a licensed electrician preform the install. So
>>> go through your contacts. Lastly I think we should meet face to face to
>>> discuss how to move forward and to review the permit draft which needs to
>>> be prepared. I will be out of town this weekend but will be available via
>>> phone. This
>>> <http://www.oaklandparkfl.org/cityservices/forms/documents/ElectricalPermitApplication2012.pdf> is
>>> the permit. Also you may find this
>>> <https://docs.google.com/spreadsheets/d/1Fgw5himtlmemiXReP-fG6rP-I2RoXsSP_MAZxcNUUm0/edit#gid=548047702>useful,
>>> the information is not exactly correct but please feel free to use it for
>>> reference- it is what we started with to get a handle of material cost and
>>> scope of Sudo's electrical needs.
>>>
>>> Whit
>>> 510-396-5510
>>>
>>>
>>> On Fri, Aug 29, 2014 at 1:13 PM, <hol at gaskill.com> wrote:
>>>
>>>>  Steve I am forwarding this thread to Whitney who drafted our
>>>> electrical plans and has been spearheading the electrical effort, and can
>>>> probably give you a better answer on the exact permit timeline and costs.
>>>>
>>>>
>>>>
>>>> cheers
>>>>
>>>>
>>>>
>>>>
>>>> On 2014-08-29 11:24, Steve Orth wrote:
>>>>
>>>> I think that we're almost ready with our plans. Would getting them to
>>>> you by Tuesday afternoon work for you?
>>>>
>>>> On Friday, August 29, 2014, <hol at gaskill.com> wrote:
>>>>
>>>>>  Hi Steve,
>>>>>
>>>>>
>>>>>
>>>>> We were planning to pull a permit for sudo room's electrical work
>>>>> which is fully planned out.  There is some overhead of getting the permit
>>>>> and the inspection, which I believe is ~$160 which could be spread over the
>>>>> 2 projects.  Throughout the building we are planning to address things
>>>>> specifically called out in the fire inspection, which will be covering
>>>>> junction boxes for the most part.  How close are y'all to having a plan
>>>>> ready?
>>>>>
>>>>>
>>>>>
>>>>> Cheers
>>>>>
>>>>>
>>>>>
>>>>>
>>>>> On 2014-08-29 10:56, Steve Orth wrote:
>>>>>
>>>>> Hi,
>>>>>
>>>>> This is Steve from la Commune. I hear that Sudo was going to apply for
>>>>> some building (electrical) permits. La Commune is going to be doing the
>>>>> same. I was wondering what you all thought about the idea of us applying in
>>>>> the same bundle to possibly save cost?
>>>>>
>>>>> Im not even sure if this would save cost. But maybe it would?
>>>>>
>>>>> Hope you're both well.
>>>>>
>>>>> Thanks,
>>>>> Steve
>>>>>
>>>>>
>>>
>>> _______________________________________________
>>> sudo-discuss mailing list
>>> sudo-discuss at lists.sudoroom.org
>>> https://lists.sudoroom.org/listinfo/sudo-discuss
>>>
>>>
>>
>> _______________________________________________
>> sudo-discuss mailing list
>> sudo-discuss at lists.sudoroom.org
>> https://lists.sudoroom.org/listinfo/sudo-discuss
>>
>>
>
>
> --
> *Be seeing you.*
>



-- 
*Be seeing you.*
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://sudoroom.org/pipermail/sudo-discuss/attachments/20140830/ac19d914/attachment.html>


More information about the sudo-discuss mailing list