If approved by the Omni Collective, we would need to build:
If approved by the Omni Collective, we would need to build:


1.- A 2" or so high floor (two by fours and plywood would do, I believe.
* A 2" or so high floor (two by fours and plywood would do, I believe.
2.- A 55" x 65" cage with walls made of chicken wire and a door.  
* A 55" x 65" cage with chicken wire walls and a door.  


If this place is not approved then perhaps we should consider
If this place is NOT approved by the OOC then perhaps we should consider
building the Server Room in the SudoRoom Space. High temperature levels and noise are the main issues.   
building the Server Room in the SudoRoom Space. High temperature and noise levels are the main issues.   


If others have ideas/comments/or want to be part of this process please
If others have ideas/comments/or want to be part of this process please