Joe,
Has all the Accessibility signage been mounted, do you know?
We need to close up the hole in the hallway wall as well before scheduling the final. Is
anyone planning on doing that yet?
Best
David
On Sun, Jan 8, 2017 at 9:00 PM David Keenan <dkeenan44(a)gmail.com> wrote:
7pm
On Sun, Jan 8, 2017 at 6:56 PM joseph liesner <blue393(a)lmi.net> wrote:
What time will you all be at Omni on Monday.
joe
On Jan 6, 2017, at 4:49 PM, David Keenan wrote:
Hi guys,
Omg. Thank you all so much for working on this!
(CC'ing Maureen & Yar who are planning to meet up with me & Tara Monday, to
talk about our longer-term accessibility plan).
Fwiw I don't know if the keycard access is ADA-compliant or not. If I had to guess, I
suspect it is compliant since folks swipe at grocery stores and other mandatory-accessible
places -- and as long the swipe is not mounted too high up, which I don't think it is
-- but, I've never looked into that specifically so I can't say for. Something to
look up.
I can't think of anything non-compliant about having a locked door, openable by the
electronic / swipe system. IE my understanding is, when the card is swiped, the throw is
engaged and the door can be opened by just pushing down on the handle. The outstanding
issue is likely the amount of force required to then open the door which last I checked
was >5lb/pressure.
On this tip BTW I also went over this week and renewed our associated, recently expired
electrical E permit that I realized would have also prevented us from finalling this B
permit (I think we forgot to extend the electrical with the building permit so it expired,
cost to renew: $205) so now there is no block in that respect either..
Our new/old E permit for the record:
E1700088 Elec Permit ext.of E1601588_2017-01-04...
Yay, the signs arrived? Joe, that's great! I don't think I ever heard back as to
whether they were ordered so I'm relieved to hear it -
Re: fulfilling the entryway accessibility requirements in general, first it might be a
good idea to briefly skim the B permit's accessibility worksheet as submitted (quick):
Accessibility Worksheet - cafe area - FINAL AS ...
Some things on this worksheet we're not gonna do right now, like the kickplate for
example -- since, even if we have it on hand (which I think we do?) installation makes
little sense to me at least without the automatic opener it's supposed to activate --
while installing a nonfunctional button like this would actually open us up to increased
liability, compared to not having it..
But hopefully the signage will allow us to schedule the final inspection, close our sole
open complaint and then finally be done with it :)
It should be said though that, since as I understand it, we will now have accessibility
signage outside advertising the corner door an accessible entrance, we are at
significantly increased risk of accessibility or code complaint, since the corner door is
not yet actually legally accessible.
The most noticeable aspects being: last I checked:
..still >5lb opening pressure for the wider door,
..>2% grade in the front landing, and
..the sidelight door is also very hard to open (i think the closer is mis-adjusted for
that smaller door)
Therefore, IMO with the signs up we really do have to make that door actually accessible
ie install an automatic opener --
Earlier this year, I got a quote on that for materials & labor (primarily in order to
help Mary Ann prepare for an accessibility grant):
Platform Lifts & Opener Quote LAS 2016-11-07.pdf
The 'Open Sesame' opener listed in the above quote is $2800 -- half of that cost
is labor, warranty, code compliance stuff. (The other stuff is to e.g. replace our
residential platform lift with a commercial one, if the one jerry had stored for us is no
longer available..) I do hear these openers break down all the time so it might be worth
it but we should think about getting this done IMO.
To this end I would propose if we have any extra funds (such as from the excess ~$30K
from the $1M stock donation?), we have these contractors out to install the opener and
then we no longer need to worry about having a genuinely accessible front entrance since
it will provide equivalent accommodation re: the opening force & exterior grade.
my 2c -
Thank you Joe!!
Best,
David
On Fri, Jan 6, 2017 at 3:11 PM, joseph liesner <blue393(a)lmi.net> wrote:
yes Jake, that is a very nice option to have. Robb does not think
we need to do that for our inspection next week . What do you think David?
I'll check further and let you Jake, know if we need to use that option.
Thanks so much
joe
On Jan 6, 2017, at 12:05 PM, Jake wrote:
Joe,
do you mean you want the door to remain unlocked for certain periods of time?
we can program the computer to simply keep the latch activated for hours at a
time, that's easy.
-jake
On Fri, 6 Jan 2017, joseph liesner wrote:
> I am about to start hanging the access signs required
> to close out our entry hall building permit.
> I can only assume that for the inspection the access
> door on the corner of Shattuck and 48th should open
> just by holding the lever handle down then pulling
> (no key or card needed).
> Please let me know how to make this possible.
> Thanks
> joe