Thanks everyone for your efforts so far!
*Remaining jobs to finish by early Thursday morning, in vague priority
order, and probably not exhaustive*
* Shattuck and 48th st doors - adjust panic bars and door hardware so
they open easily
* Remove or safely store fluorescent tubes that are in corner of EH
* Put a gas shutoff wrench by gas meter if there isn’t one
* Safely store boxes of batteries in sudo
* Install smoke detectors (in locked storage)
* 48th st hallway - rehang fire extinguisher, paint and install
baseboards and or molding if we have, remove blue tape, final mop,
leave completely clear (bonus points if you can mop/scrub the
hallway to the bocce court with TSP while you're at it)
* Matt, Monk, electrical crew - fisnish mapping electrical system,
covering open panels, emergency lighting and exit signs installed
and functional, wiring, replacing eh fixtures, etc
* *BASEMENT - organize onto shelves or get rid of all stuff in piles;
Make basement look like storage, not event space; store Ken finish
removing stuff, organize printers, remove all shiny stuff from
ceiling, remove and store all extension cords *
* Finish painting wooden windows
* Remove/paint over small amount of graffiti on outside of building
towards 48th st doors
* *Finish and install awning
*
* Move stove remnants, other metal from basement kitchen to EH for
metal waste pickup on Wednesday
* Bocce court bathroom - clean and organized, w compost and trash cans
* 48th st hallway - *rehang fire extinguisher*, paint and install
baseboards and or molding if we have, final mop, leave completely clear
* Stage left bathroom -*paint stained side of ceiling w glossy white*,
also stalls. remove graffiti on mirror, general cleaning
* Disco room - *finish painting*, *clean plexi floor*, remove mirrors
that aren’t hung to dump or store safely, restick Marley (tape in
cabinet is disco room - Luka watched video on how to lay properly.
If there isn't time for this just layit out flat over the floor )
* Small classroom- remove excess chairs, boxes in front of electrical
panel, cobwebs, straighten out
* Bathrooms cleaned
* Ballroom bar - final sweep and organize
* Trash room - should look organized w minimum stacked cardboard
* Make sure Shower is not dripping
* Entry area to bocce court organized
* Get rid of all trash piled in sudo
* Basement northwest corner (where Village stuff was) ceiling water
damage - cover and potentially replace damaged ceiling tiles
* Remove hanging wires in den. If time, prime and paint ceiling
* Sudo mesh area organized
* Move Stage section upstairs
* Fix broken stair steps
* Disco room door - Wash w tsp; if time, prime and paint w grey in the
storage
* *Wednesday evening - fisnish up any work in progress, general
cleaning and organizing so everything is in its place, organize
trash cans in rooms (a trash, recycling and compost can grouped
together, except bathrooms need one compost and one trash) and put
in bags/liners *
*
*