I'm not making it to the meeting this evening. I have a draft together
minus the quantity sheets, however, current q estimates are included
in the shared
spreadsheet
<https://docs.google.com/spreadsheets/d/1Fgw5himtlmemiXReP-fG6rP-I2RoXsSP_MAZxcNUUm0/edit#gid=1763218143>
under
the Qty. tab. You will notice that the estimate is $1k. Please take a look
at the pdf's and mark them up however you like and send me red-lines I will
then make v1.1 of the package with hopes of getting the q sheet(s) done by
Friday. Additionally, I request that my August and September dues be in the
form of electrical design and installation. Lastly, because I am not a
licensed electrician, these drafts need to be reviewed by a professional
prior to construction. It would suck if we had to re-run or otherwise
modify our work once the inspector comes. So if anyone has an electrician
friend that can weigh in that would be helpful. Also has anyone put any
effort into weather or not we need a permit prior to beginning this
improvement?
Thanks,
Whit
On Wed, Aug 20, 2014 at 3:42 PM, <hol(a)gaskill.com> wrote:
as long as it's only to fool a pin on the
controller that should be
fine. are you familiar with rotary phase converters? i looked into this
issue a while back when i was foolishly considering purchasing a bridgeport
mill and it came up on the forums as the best thing for big 3 phase
inductive loads. i'll have to look at those pdfs you posted to get up to
speed on the specs for the motors themselves. big props to really getting
in there and hacking this thing jake, definitely above what i would have
ever bitten off.
cheers
On 2014-08-20 15:33, Jake wrote:
I think the balcony breaker has plenty of power, it's got 200A x 230V service from
the other breaker, and we'll never use even 50A total ever.
as for the robot power, I figured out how to fake out the third phase, using a 1666 ohm
resistor and a 10uF capacitor, because I don't actually need the third phase for
power, only to fool the motor controllers into thinking power is there.
the motor controllers are just rectifying the AC into DC so it doesn't matter whether
there are three legs of AC or only two (which we have)
I agree that we should run 230v to the shop area, which we need for the robot anyway.
Other appliances (welders and stuff) can just share the circuit.
-jake
On Mon, 18 Aug 2014, hol(a)gaskill.com wrote:
do y'all know what the rated amperage to the balcony panel is? i thought
i had it but i only have the label numbers in the document i was thinking
of. might be good to run 230V over to the shop area too. for the robot's
3-phase power, they do make rotary phase converters which seem to be
commonplace for switching between single phase and 3 phase, basically a
single phase motor with a 3 phase genset
http://modesto.craigslist.org/tls/4619369559.html i am stoked about
electrical upgrades - do y'all know if anyone is working on ventilation
too? david was thinking for one area of running a blower as the first
stage up into one of the existing roof-mounted exhaust fans. if we can get
230V and exhaust in the shop corner we are in serious business. cheers
On 2014-08-17 21:31, Jake wrote: Hi Whit, Sorry I didn't write back to
your previous post! I am super glad you're here, your skills are exactly
what is needed. I would say that you have more experience running pipe an d
wire and installing outlets than I do, so I will call you the lead on
making this happen. I looked at the attached PDF (I hope you saw the
spreadsheet I made too) and I think that your map is very complete. I had
been thinking of about half as many outlets, but you are right to suggest
we do the job right the first time, rather than rush ing to get it done.
That said, if we find ways to leave some outlets for later (after the
upcoming fire inspection) we should keep in mind that the priority right
now is to eliminate use of extensi on cords, and do so ASAP. We can always
add more service later. As for service levels, I believe the standard 20
amp breaker for each leg of outlets (shared by two boxes of two duplex
sockets each) will be plenty for all outlets. we will no t be running more
than one 20A circuit worth of servers or anything else, and the only
high-power users are temporary things like occasional power tools. About
the robot: the breaker labeled for it (in the middle on the right, at the
balcony panel) is connected right now! you can see the wire running down to
its control box. I t is "temporary" but has been very important in working
on the robot to figure out what we need next. I would like for us to add
service (red black white and green) to the area you listed as "Plug J" for
the robot, since it will be located there according to consensus. The buil
ding does not have 3-phase power though, so I will be doing some
electronics magic to make the thing run anyway. I looked into the hanging
outlets phenomenon (the ceiling beams are pretty high in sudoroom) and I
don't think we should hang extension cords.. are you familiar with the
"correc t" way to make power drops? I believe one is supposed to use
twist-lok cord-mounted sockets on tension-rated cords, grabbed by special
strain reliefs when they leave the juncti on boxes high up. Then one can
make regular outlet boxes with twist-lok plugs to connect to the hanging
service.. but i really don't know what's "right". Anyway, since
you're the
lead on this project, please let us (sudoroom and the omni) know what your
budget is (consider editing the spreadsheet I made) and when you are
availabl e to start. Also, please tell us how many helpers you want and
when, and what skills are desirable. I volunteer myself both for electrical
work (i do have those skills) and for helping coordinate other volunteers.
I can also help get supplies, when we know exactly what to get . After we
complete the installation, we will hire a professional electrician to
inspect our work and sign off on it, so we can be partially reimbursed by
the landlord. thank you -jake 415-533-3699 On Sun, 17 Aug 2014, Whitney
Lawrence wrote: Jake,I understand you are the Lead for the electric
install. Please look at the attached .pdf, I made a first pass on the
locations of outlets. I think we should use the 3 free breaker spaces in
the Balcony breaker box, in addition to the abandoned "marquee" breaker.
Looking at the front of the Sub-panel above the stage it looks like the
plan is to power the robot arm directly from there, with a 30A breaker.
Also we need to figure out the plan for the conduit runs after the outlet
type and locations are finalized. We will need volunteers to help with
prepping the space for install (moving shelving etc away from walls), and
for doing the installation. Let me know what else I can do to get power to
the people! The draft should be reviewed by everyone to be sure we are
planning for all needs. For example- what are the immediate power needs
for the server? Can we build in the potential for up-sizing? Similarly for
the robot arm- where will it be located? It requires 3phase 240 correct?
Thanks, Whit